Doboku Gakkai Ronbunshu
Online ISSN : 1882-7187
Print ISSN : 0289-7806
ISSN-L : 0289-7806
PREDICTION FOR BEHAVIOR OF GROUND HEAVE AND EXISTING TUNNEL DUE TO OPEN CUT
Hitoshi OKADAMasumi NAKAMURAYasuhiro KASAIMitsuo KURIHARAMinoru YAMAMOTO
Author information
JOURNAL FREE ACCESS

2004 Volume 2004 Issue 763 Pages 53-69

Details
Abstract
This paper presents the simplified numerical method for predicting the behavior of ground heave and existing tunnel due to open cut. This method uses Steinbrenner's form considering the strain level-dipendency of deformation modulus of ground to calculate the ground deformation and stress, and the beam model supported by ground springs to calculate the deformation and section forces of the tunnel. These calculations are verified by comparing with 3-dimensional finite element analysis and field measurements. Regarding monitoring of existing tunnel during open cut, this paper shows that the numerical method for calculating the real-time section forces of the tunnel is verified by comparing with shell finite element analysis.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top