Journal of Japan Industrial Management Association
Online ISSN : 2432-9983
Print ISSN : 0386-4812
Predicting the Processing Time Including the Down-time of the Equipment
Ken-ichi FUNAKI
Author information
JOURNAL FREE ACCESS

1994 Volume 45 Issue 1 Pages 1-6

Details
Abstract
In predicting the processing time, the down-time caused by either the failure or the disorder of the equipment must be considered. In this paper, the theory for predicting the processing time including the equipment down-time is presented. Furthermore, an approximate and useful prediction for a shorter processing time is also presented.
Content from these authors
© 1994 Japan Industrial Management Association
Previous article Next article
feedback
Top