Abstract
In the previous paper, we attempted to solve the scheduling problem for minimizing the total actual flow time by using a stochastic neural network model, and confirmed applicability of the neural network model for this problem. In this paper we propose a method for using the neural network model for a sampling scheme. Furthermore, we apply this method to solve the scheduling problem for minimizing the total actual flow time with direct and indirect preceding relations.