抄録
In 2010 temperature and moisture sensors were made and installed into the pavement and subgrade of the "Astana-Burabay" highway (North region of the Kazakhstan). In 2013 similar sensors were used for the "Atyrau-Aktobe" (West region) and "Almaty-Bishkek" (South region) highways. In the present paper the study results of subgrade frost penetration of the above stated highways are given. For each highway a subgrade frost penetration starting and finishing times are determined; frost penetration and thawing graphs are constructed; frost penetration and thawing rate values are determined; dependence of the amount of unfrozen water from the value of negative temperature and initial moisture is established.