This paper describes the effect of mutual leakage reactance in rotor circuit on analysis of generator transient characteristics. The authors derived a detailed equivalent circuit model for 48P-15750kVA generator, and analyzed sudden short circuit, asynchronizing phenomena of the generator by simulations using the electromagnetic transients program (ATP-EMTP), and compared the results with the experimental data.
A member of IEEJ can access the transactions of the Technical Society to which the member belongs. Please enter the My Page login ID in the subscriber number column and the birth date (year/month/date with one-byte characters: for example, 19800303) in the password column.