DEVELOPMENT OF METHODS FOR MICRO PLANNING OF PROCESS : Planning for a building construction process (Part 2)
NARUO KANO
Author information
JOURNAL FREE ACCESS

1986 Volume 363 Pages 94-103

Details
Abstract
This study presents the rational approaches to the process planning and scheduling for a building construction with computer systems. In the paper, the author put the focus on the methodology for planning and scheduling of activities in construction process, using a graphical presentation and system simulations with GPSS. The author has developed the graphical method of presenting the status of activities in construction process. This graph is called "Process Graph", which represents the activities, precedence relations among activities, resources, building elements, space and those interactions. Process Graph could be translated into GPSS language automatically, therefore it is very easy to develop a model of system simulation for construction processes. The methods described here were applied to planning of activities in reinforcing works.
Content from these authors
© 1986 Architectural Institute of Japan
Previous article Next article
feedback
Top