A STUDY ON THE ACTUAL CONDITIONS OF RENEWAL AND VERIFICATION OF "EVALUATION METHOD FOR JUDGMENT ON RENEWAL TERM" IN THE GOVERNMENT OFFICE BUILDINGS
Hiroshi SUGITASaburo MURAKAWATeruyuki FUJIKAMINISHINA Daisaku
Author information
JOURNAL FREE ACCESS

2002 Volume 67 Issue 553 Pages 275-282

Details
Abstract
The purpose of this study is the verification of the applicability of "The formulas which can conveniently calculate at Life Cycle Cost (LCC) considering the maintenance conditions" that had been sueeested previously by us to the government office buildings. First, the actual conditions of each maintenance cost in those buildings were clarified, and the renewal costs in those buildings were analyzed. Next, the difference of the managements of maintenance costs between the private office buildings and the government office buildings was shown. The main differences were as follows; 1) Comparing with the private buildings, the government office building's commission costs were lower and the expenses for electricity were a little higher. 2) Although the expenditure times of maintenance costs in the private buildings were concentrated at the same stage,the times in the government office buildings were not concentrated. As a result of having applied the formulas to the government office buildings, the formulas were useful to those buildings. Besides, the execution times of the renewal in the buildings were considered by having applied "The evaluation method for judgment on renewal term".
Content from these authors
© 2002 Architectural Institute of Japan
Previous article Next article
feedback
Top